10-8-07 2nd Floor Progress


This is a sitting area on the second floor across form the elevator.   (31kb) Looking down the 2nd floor hallway from near the elevator (41kb) A view from the Looking down into the community room from the 2nd floor (42kb)
The ceiling grid is in place in this 2nd floor room it is almost ready for dry wall. (37kb) The sprinkler system is in place in the attic. (49kb) looking down from the ceiling at the entrances of 2 rooms on the 2nd floor. (49kb) Looking down the 2nd floor hallway. (50kb)