12-10-2007


Drywall is hung and plaster in the community room. (35kb) Looking down into the community room (35kb) A railing will be installed along the upstairs hallway looking down into the community room (38kb) Looking up at the 2nd floor hallway on either side of the chimney. (45kb)
snow covers the patio.  A deck & stairs will soon be added over 1/2 of the patio (31kb) Tile is being set into place in the restrooms (27kb) Sink cabinets arrived 2 weeks ago. (28kb) Linen cabinets for the restrooms also arrived (27kb)
Cabinets are being stained and varnished after the doors were removed. (27kb) Sink tops without the Cabinets doors were recenltly sprayed with varnish (33kb) Linen cabinets wait to be set in place and have their doors reattached. (26kb)
11.jpg (23kb) Hmmm.... Maybe frames for medicine cabinets with a corner shelf? (currently laying on their sides) (37kb) A room with wood trim stained and varnished. (24kb) A painted room  (22kb)
Another room whose walls have been painted. The wood has not been stained. (17kb) A diagram in the basement marking tile placement (30kb) A door frame recently set into place (41kb) A Propane heater heats the basement. (31kb)
The basement (31kb) Heating vents int he basement (26kb) 20.jpg (34kb)