7407


Workers lift supplies onto the 2nd floor (88kb) Much of the roof is complete - A crane hovers over the community room (100kb) Brick work on the east end of the building (112kb) 4.jpg (95kb)
Drywall being unloaded (90kb) The dry wall is unloaded through a 2nd floor window (95kb) 7.jpg (101kb) This load of dry wall will be used on the 2nd floor ceiling . Note the pluming coming up through the floor. (84kb)
At the far end you can see the massive arched beams of the community room (117kb) 9.jpg (93kb) A view of the beams from inside the building (85kb) 11.jpg (64kb)
More parts to be assembled! (75kb) A 2nd Floor view of the arched beams (78kb) Looking down the 2nd floor hallway. (85kb) An interesting view of the roof structure & supports (101kb)
Electrical conduit dangles in the first floor rooms (94kb) Plumbing progress is being made throughout the structure (55kb) 2nd Floor showers wait for installation in the rooms. (47kb) A good view of how the addition connect to the existing building (100kb)
A complete view of the south side of the addition. (89kb)