A Walk Through the Construction Site


Elevator in the Fore Ground  (61kb) Masons setting Metal plates for beams (63kb) DSC09905.jpg (64kb) Crane moves a form on the free standing wall (80kb)
Elevator shaft to the left. Looking at entryway to the Dining Room. A patio & deck will be located here (73kb) Free Standing wall. Lower will be dining room, upper will be the community room (91kb) Another view (81kb) DSC09911.jpg (77kb)
From inside the dinning room looking at the free standing wall. Note the forms for the windows (75kb) Looking down the basement hall toword the Abbey (57kb) A future Kitchen area (84kb) Entrance to the elevator (58kb)
Another look at the dining room & entrance from the patio (60kb) Exterior view: Dinning room to the left, Kitchen to the right (82kb) Exterior of basement on the south side (74kb) DSC09944.jpg (78kb)
DSC09945.jpg (76kb) DSC09946.jpg (75kb) DSC09960.jpg (90kb) Cement Stairs will run along the exterior wall descending to outside the basement. (59kb)
DSC09962.jpg (56kb) Drilling Geothermal wells (74kb) Ends of tubing that go down 300 feet.  (126kb) A series of the Geothermal well tubing. (77kb)
More... (63kb) From in front of the building looking down into the kitchen & dinning room (54kb) Looking at Patio & Deck Area against the Elevator Shaft (80kb) DSC09977.jpg (86kb)
DSC09978.jpg (70kb) DSC09979.jpg (55kb) DSC09980.jpg (73kb) Standing in the dining room looking north. Fireplace on the right (52kb)
Hallway to Current Abbey Basement.  They will cut into the wall straight a head. (65kb) Looking down the hallway in the basement. Back of the fireplace to the right (51kb) The bottom of elevator shaft with the tube for the hydraulic  piston (48kb)