Construction Continues to Progress


Masons working on the elevator shaft. (106kb) Cement is poured into the block hallows.  (103kb) DSC09846.jpg (99kb) DSC09847.jpg (102kb)
A machine carries another load of cement to the masons working on the elevator shaft (84kb) A view of the new wing from outside the abbots office (107kb) DSC09851.jpg (65kb) A nice view of the elevator shaft and the free standing wall (93kb)
A cement pump reaches across the work site to place cement for  the free standing wall (136kb) The Cement pump (76kb) Drilling Geothermal wells (69kb) Geothermal wells being drilled (69kb)
Preparing forms for the second level of the free standing wall. (68kb) DSC09877.jpg (76kb) Masons working on the hallway that will connect the new addition to the abbey.  (82kb) Wells being drilled at the far end of the addition (50kb)
A few from outside the Abbey (86kb) The first part of the addition to rise above the horizon! (98kb) DSC09893.jpg (48kb)