Hollow Core Placement & 1st Floor Block Work Begins


Hollow Core Sections Arrive (100kb) The First Sections are in Place (51kb) Dropping in another section of Hollow Core (41kb) A Birds Eye View (51kb)
Looking down the future hallway (40kb) 2nd level of 3 Storey Wall has been poured (62kb) Looking down into the Dining Room.  The Fireplace in the foreground (72kb) DSC00031.jpg (63kb)
Looking down into the future Kitchen (81kb) DSC00036.jpg (68kb) Looking Back at the Abbey (59kb) The beginnings of the Eastern stairwell (57kb)
Abbot Raphael Peers Out the Wndow at the Construction. (58kb) DSC00044.jpg (61kb) Seams between the hollow core sections will be filled in with a rough grout of cement. (72kb) A sturdy plank walkway is used to access 1st floor construction. (45kb)
eSC00003.jpg (65kb) Block work begins on the 1st floor (57kb) The forms removed from the level of the Block Work (45kb)
eSC00017.jpg (67kb) eSC00018.jpg (57kb)