Interior work and stairwell


Looking East down the 1st floor hallway (44kb) A nice view from a top floor room before the floor was poured (55kb) Looking west down the top floor hallway to the Abbey building (50kb) The
Looking down the hallway from the Abbey (45kb) Breaker panels and stairwell entrance on the top floor (54kb) A lip being added to the ledge that overlooks the community room (70kb) Rebar anchors the chimney into the floor (51kb)
The main entrance into the addtion. (61kb) The top floor is poured! (39kb) The main electrical junction box mounted in basement. (50kb) A small portion of the
Start of the stairwell (54kb) Top floor stairwell landing (61kb) Steps leading to the basement (58kb) The stairwell entrance on the east end of the Addition. (70kb)
The stairwell entrance on the the 1st floor. (56kb) stDSC00584.jpg (47kb) stDSC00587.jpg (82kb) stDSC00590.jpg (60kb)
stDSC00592.jpg (41kb) stDSC00595.jpg (39kb) stDSC00597.jpg (44kb) stDSC00603.jpg (61kb)