The entry Way. A tile floor needs to be installed and the drop ceiling set in place (53kb) Wood work is nearly complete, Some light fixtures need to be installed and at the far right is where the door needs to be installed. (43kb) Ceiling fixtures installed (32kb) Note the railings on either side of the fireplace. You can also see some tile being set in place (61kb)
Tile being set in the The cabinets are in place. A refridgerator and microwave etc. will provide a place for monks to fix a snack. (41kb) The Private rooms are complete! (25kb) These doors will go from the Community room to the deck. (50kb)
Other doors for the basement are being finished (39kb) The drop ceiling in a hallway (39kb) Walls have been painted in the basement even in the areas that won't be Wood work for the basement is set on the floor and being finished. (61kb)
Looking onto the patio from the dinning room. Note the deck edge in the top of each window. The Stairs down from the deck in the top right window and the stairs down from the sidewalk in the lower middle window. (34kb) The