May: 1st Floor Interior and 2nd Floor Construction


The first floor hallway (38kb) The east end; rooms and hallway area without interior walls (34kb) Looking down the hallway at the current Abbey (40kb) Looking up at the 2nd floor hallway from the community Room a railing will be put in place on either side of the fire place. (82kb)
The Second Floor! (44kb) Looking over and accross the community room toward the Abbey intersection. A railing will be built on either side of the fireplace (82kb) Traditional Scaffolding on the South Side (Back) (70kb) Looking down into the community room from the 2nd floor hallway.  A railing will keep you safe! (67kb)
Looking down the 2nd floor hallway toward were it will intersect with the current Abbey (56kb) Looking down on the 1st floor A view of the growing 2nd floor walls (52kb)
A view from the back of the addition. Elevator shaft to the far left and the free standing wall enclosed in forms. (64kb) Muddy mechanical vents for the community room after being submerged in 6 inches of water. (55kb) The new stairwell. Not ready for service! (58kb) East end of the second floor (63kb)
2nd floor south wall grows! (67kb) Looking down into the community room outside of the elevator (56kb) Looking down the hallway from outside the elevator. Chimney to the right. (50kb) Water on the 1st floor after a recent rain.  (51kb)
Wednesday Morning May 16th 2007 (88kb) eDSC00442.jpg (65kb)