May: First Floor and Backfill


Looking over the Looking down on the 1st floor after it was poured (129kb) Once the floor was poured backfilling began (114kb) Backfilling nearing completion (118kb)
Packing the soil well! (114kb) c4.jpg (79kb) Walls growing on the 1st floor (102kb) The
Working on the floor area that connect the new addition to the existing abbey building (67kb) Pouring cement for the A nice view of the front. Note the hydraulic scaffolding being used on the front.  (122kb) f2.jpg (112kb)
A view from the Abbey's front entrance (112kb) The second floor front walls  (98kb) f5.jpg (64kb) Masons at work (106kb)
More floor panels for the second floor (95kb) PICT0005.jpg (106kb) Masons making good progress (113kb) PICT0011.jpg (90kb)
PICT0020.jpg (68kb) PICT0021.jpg (137kb)