The Initial Excavation Slowed by Gas Line


The stakes with pink tags mark the outline of the new addition (60kb) A closer look. The stakes on the right & left mark the east end of wing. (50kb) DSC09170.jpg (43kb)
This is looking down the end of the future residence hallway to the Abbey (39kb) DSC09172.jpg (54kb) Equipment stands in silence waiting for the gas company to move the line. (54kb)
DSC09174.jpg (50kb) The gas line Marked in Yellow! (58kb) Photo from on top of a mound of dirt (47kb)
DSC09177.jpg (61kb) The excavation needs to go an entire floor lower than it is here. It will be a big hole! (62kb) The gas line's yellow flag (69kb)
Photo from on top of a mound of dirt. (43kb) The view from the Abbey entrance (63kb)